DEP Enhanced Mailing List - View List Message
This Message was sent out on Thursday, September 28, 2017 @ 03:08 PM
| From: | dep.online@wv.gov |
| Subject: | DEP Public Notice - WV NPDES Water Pollution Control Permit Application - Braxton County - Flatwoods-Canoe Run PSD |
STATE OF WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER AND WASTE MANAGEMENT PUBLIC NOTICE WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S, PUBLIC INFORMATION OFFICE, 601 57TH STREET, CHARLESTON SE, WEST VIRGINIA 25304-2345 TELEPHONE: (304) 926-0440. APPLICATION FOR A WEST VIRGINIA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM WATER POLLUTION CONTROL PERMIT Public Notice No.: L-109-17 Public Notice Date: October 10, 2017 Paper: Braxton Citizens' News The following has applied for a WV NPDES Water Pollution Control Permit for this facility or activity: Appl. No.: WV0084042 Applicant: FLATWOODS-CANOE RUN PSD PO BOX 677 SUTTON, WV 26601 Location: SUTTON, BRAXTON COUNTY Latitude: 38:40:00 Longitude: 80:47:50 Receiving Stream: ELK RIVER Activity: To operate and maintain an existing combined wastewater collection system and an existing 0.72 million gallons per day wastewater treatment plant. These facilities are to serve a population equivalent of approximately 7,200 persons in the Flatwoods-Canoe Run Public Service District, including the Town of Sutton and the Town of Gassaway, Buckeye, Skidmore Run, Chemical Town, Catholic Hill, and Buffalo areas of Braxton County and environs, and discharge treated wastewater through Outlet No. 001 to the Elk River, approximately 93.6 miles from its mouth, of the Kanawha River. An antidegradation review has been conducted. Tier 2 protection is afforded for all parameters of concern requiring that protection. The agency made a determination that the activity will not cause significant degradation to the receiving stream. Also, to operate and maintain disposal systems, best management practices, and the nine minimum controls for the direct discharge of sanitary wastewater and storm water from Combined Sewer Overflow (CSO) Outlets C002-C006 and C008 to the Elk River. These CSO Outlets are permitted to discharge only when the hydraulic capacity of the collection system is exceeded during wet weather events. Tier 1 protection shall be afforded the discharges from combined sewer overflow relief points C002-C006 and C008 through implementation of the Long-term Control Plan. Also, to accept nondomestic wastewater from Central WV Refuse Landfill for subsequent treatment and disposal. Also, to incorporate the requirements relative to Title 33, Series 2 of the West Virginia Legislative Rules for the processing and disposal of sewage sludge generated by the wastewater treatment plant, sewage sludge generated and/or processed at the permittee's facility shall be disposed at a landfill and land applied, provided that the sewage sludge shall not be applied in a manner that exceeds the agronomic or lifetime loading rates. This land application site(s) meet all other regulatory standards and are identified as follows: Kenna Seal farm, located at 281 Facemine Drive, Sutton, WV; Jeffrey E. Smith farm, located at 2188 Leatherwood Run, Frametown, WV; Bradley Meadows farm, located on Route 7/3 at 387 Meadow Valley, Gassaway, WV; Garry Duffield farm, located at 1851 Villanova Ridge Road, Duck, WV; Rodney Hickman farm, located at 701 North 3rd Street, Sutton, WV; John Bean farm, located at 764 Keeners Ridge Road, Birch River, WV; Donald Burroughs farm, located at 2424 Pickles Fork Road, Heaters, WV. Business conducted: Public Service District Implementation: Compliance with the Combined Sewer Overflow requirements shall be attained through Administrative Order No. 6061, issued the 26th day of April 2007, and any amendments, thereto. On the basis of review of the application, the "Water Pollution Control Act (Chapter 22, Article 11-8(a))," and the "West Virginia Legislative Rules," the State of West Virginia will act on the above application. Any interested person may submit written comments on the draft permit and may request a public hearing by addressing such to the Director of the Division of Water and Waste Management within 30 days of the date of the public notice. Such comments or requests should be addressed to: Director, Division of Water and Waste Management, DEP ATTN: Lori Devereux, Permitting Section 601 57th Street SE Charleston, WV 25304-2345 The public comment period begins October 10, 2017 and ends November 09, 2017. Comments received within this period will be considered prior to acting on the permit application. Correspondence should include the name, address and the telephone number of the writer and a concise statement of the nature of the issues raised. The Director shall hold a public hearing whenever a finding is made, on the basis of requests, that there is a significant degree of public interest on issues relevant to the Draft Permit(s). Interested persons may contact the public information office to obtain further information. The application, draft permit and any required fact sheet may be inspected, by appointment, at the Division of Water and Waste Management Public Information Office, at 601 57th Street SE, Charleston, WV 25304-2345, between 8:00 a.m. and 4:00 p.m. on business days. Copies of the documents may be obtained from the Division at a nominal cost.
